提示:
此部分只提供英文原文,敬请谅解!
4.4.7 Peak Fitting
Peak-Fitting
Peak Fitting with Baseline
Peak Fitting with Preset Peak Parameters
Setting the Fix, Share Status or Bounds for Multiple Peak Parameters Simultaneously
4.4.1 Create and Subtract Baseline with Peak Analyzer
4.4.2 Use Script to Search for Baseline Anchor Points in Peak Analyzer
4.4.3 Batch Peak Analysis Using Theme with Script Before Each Process
4.4.4 Combine Quick Peaks Gadget with Peak Analyzer
4.4.5 Peak Finding
4.4.6 Peak Integration
4.4.7.1 Peak Fitting with Baseline
4.4.7.2 Peak Fitting with Preset Peak Parameters
4.4.7.3 Setting the Fix, Share Status or Bounds for Multiple Peak Parameters Simultaneously